Project Story: Sainte-Thérèse High School Outdoor Lighting Upgrade

August 6, 2024

Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots. 

The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation work, enabling safe navigation for everyone – from cyclists to pedestrians and drivers – by installing separate lanes for each user.

Safety was priority number one throughout the entire project, including when it came to the choice of lighting for large outdoor areas, which required powerful illumination to ensure maximum visibility.

“Our priority was to create a space where users could circulate safely all year long,” says Youri Leblanc-Thouin, material resources services manager for the Centre de services scolaire des Mille-Îles. “Whether it’s all the kids at day camp in summer, or people exiting the building when it’s dark in wintertime. Not to mention better lighting means less likelihood of vandalism.”

Project designers selected Trika luminaires, which come with sleek, modern lines and fit seamlessly into the newly refurbished environment. Renowned for its flexibility, Trika is available in a variety of mounting types, including post-top, medium or maxi-sized lateral mount, wall mount, or bollard. For this project a combination of the Trika Midi and Trika Maxi side mount luminaires were chosen.

Its high-performance light engine means Trika can offer from 3,500 up to 32,500 delivered lumens, to effectively illuminate a variety of outdoor applications including streets, buildings, parks, or pathways. Trika Midi, with 11,750 delivered lumens, was used for the majority of the school site. A few Trika Maxi luminaires was installed in the parking lot, delivering 32,280 lumens for maximum visibility and security.

Sainte-Thérèse

Also known for its durability, Trika’s high-performance IP66 rated optical systems provide optimal, reliable lighting in even the most challenging environmental conditions. Trika was therefore an appropriate choice for this project so that it will stand up to the cold and wet Quebec winters.

The project was a success, despite delays caused by the pandemic, phase 1 of the renovation work was completed on time. The school now boasts a living space that’s safe, stimulating, and favorable for learning and success. Talk about smart choices!

Project name: Sainte-Thérèse high school – Phase 1
Where: City of Sainte-Thérèse
Category: Outdoor lighting
Product mentioned: TRIKA products
Photographer: David Boyer

Related Articles


Changing Scene

  • Sept 14, 2026 - Salex Promotes Ali Saleh as New Technical Services Manager & Alana Punit as New Marketing Manager 3

    Salex Inc. Announces Two New Appointments

    Salex is excited to share another update as roles continue to evolve across the company. Ali Saleh has been promoted to Technical Services Manager, leading their Technical Services team and supporting the continued growth of their technical capabilities, service offerings and customer experience. Alana Punit has been promoted to Marketing Manager, leading marketing initiatives across… Read More…

  • Sept 10, 2026 - Symmetry Lighting Announces Elvis Bazelli as Their New Technical Sales Specialist

    Symmetry Lighting Announces Elvis Bazelli as Their New Technical Sales Specialist

    Meet Elvis Bazelli, Symmetry Lighting’s new Technical Sales Specialist!⁠ Elvis brings a great combination of technical knowledge, field experience, and a background in commissioning lighting control systems to his new role. He will be working closely with Symmetry Lighting’s Sales and Controls teams to help support their clients with product applications and solutions. Symmetry Lighting… Read More…


Design

  • CSC LED: Top 6 Time-Saving Lighting Features for Faster Installs

    CSC LED: Top 6 Time-Saving Lighting Features for Faster Installs

    When it comes to lighting projects, time on site matters. Tight schedules, labour costs, and project deadlines all depend on how efficiently an installation is completed. While fixture performance is critical, features that simplify installation can have just as much impact on overall project success. Here are six key features that help streamline installs, reduce… Read More…

  • Axis Lighting: Project Highlight – Pickering College, Newmarket, ON

    Axis Lighting: Project Highlight – Pickering College, Newmarket, ON

    At Pickering College, the new West Lake House creates a dynamic environment for teaching, learning, and connection. Designed to double the school’s classroom space nearly, the new academic hub brings together flexible spaces that can adapt to different activities and ways of learning. Read More…


New Products