|

Light and Lighting — Explanation and Justification of ISO/CIE 20086 — Energy Performance of Lighting in Buildings

February 14, 2024

DOI: 

10.25039/ISO/CIE TR 3092:2023

This Technical Report on ISO/CIE 20086 was prepared by Technical Committee ISO/TC 274, Light and lighting, in cooperation with CIE Joint Technical Committee 6.

It is important that lighting schemes are designed appropriately to provide the right light in the right place at the right time, while being energy efficient and conforming to local, regional, and/or national regulations. It is also important that the lighting systems are operated energy efficiently and managed by suitable lighting control systems.

Carrying out a comprehensive lighting design (daylight and electric lighting) for new or refurbished buildings will yield both effective and energy efficient lighting solutions that fulfil the lighting criteria specified in the lighting application standards. The lighting design process will show how much daylight will be available and how much electric lighting is needed and what scheme solutions will satisfy the required lighting conditions during the occupied and unoccupied periods.

ISO/CIE 20086 gives a procedure to estimate the required energy and the energy efficiency of the electric lighting scheme.

There is a risk that the purpose and limitations of ISO/CIE 20086 will be misunderstood, unless the background and context to its content is explained in some detail to users. If this information would have been placed in ISO/CIE 20086, the standard would be overloaded with informative content; and the result is likely to be confusing and cumbersome, especially if ISO/CIE 20086 is referenced in local, regional, or national building codes.

Therefore, this document accompanies ISO/CIE 20086 and provides informative content to support the correct understanding, use and national implementation of the lighting standard. It also provides explanation of the lighting energy calculation methodology and working calculation example of integrated lighting control options. ISO/CIE 20086 defines the methods for estimating or measuring the amount of energy required or used for lighting in buildings.

The method of separate metering of the energy used for lighting will also give regular feedback on the effectiveness of the lighting control. The methodology of energy estimation not only provides values for the Lighting Energy Numeric Indicator (LENI) but it will also provide input for the heating and cooling load estimations for the combined total energy performance of building indicator.

LENI represents the absolute amount of energy required for a lighting scheme and does not directly provide indications on the efficiency of the lighting technology employed. Therefore, a concept of expenditure factors intending to render energy flows in lighting systems more transparent is introduced in ISO/CIE 20086:2019, 6.5 and Annex E to complement LENI.

The publication is written in English. It consists of 82 pages and is available on the CIE Webshop or from the National Committees of the CIE.

More information available here

Related Articles


Changing Scene

  • The Heart of the Olympic Park Transformed by Lemay and LumiGroup

    April 18, 2024 Architectural and design firm Lemay, and lighting agency LumiGroup, have combined their expertise to transform a partially under-exploited sector of the Montreal Olympic Park into a bright, warm, and dynamic work environment. Continuing their long-term history of working together on major projects, the mandate was to set up offices which would bring… Read More…

  • “Sustainable” Lighting: What Are Lighting Designers Asking For?

    April 16, 2024 By Sara Schonour, LC, MIES, IALD, Luxsi and Reiko Kagawa, LC, LEED AP BD+C, WELL AP, WELL Faculty Are you confused about what lighting designers are asking for regarding material transparency, and how they are defining the ambiguous term “sustainability”? 100+ specifying firms (114 and counting, to be exact) have signed the… Read More…


Design

  • Case Study: Windsor Family Credit Union (WFCU) with Salex SW

    Case Study: Windsor Family Credit Union (WFCU) with Salex SW

    February 6, 2024 Since 1940, WFCU Credit Union is a prominent and forward-thinking financial institution based in Windsor and Essex County. For over 80 years, WFCU has been dedicated to serving Ontario residents, community, organizations, small businesses, commercial entities, and public institutions. Their new headquarters in Kitchener was created as they continue to grow their… Read More…

  • Coaticook Suspended Footbridge: An Ever-Changing Luminous Canvas, Painted by Nature

    Coaticook Suspended Footbridge: An Ever-Changing Luminous Canvas, Painted by Nature

    December 5, 2023 At 170 m (554 ft) long and 50 m (160 ft) high, the Coaticook Canyon Bridge at Parc de la Gorge de Coaticook is one of the longest suspension footbridges in North America and one of the most popular tourist attractions in the Eastern Townships. For several years, the Parc de la… Read More…


New Products