Case Study: Centre Block Rehabilitation

EIN Lind CS Centre Block 400

February 16, 2022

The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.

TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration

project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.

Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted LED Jobsite lighting throughout the project.

When compared to traditional bulb-based temporary lighting, LED Jobsite lighting reduces energy consumption by 65%. The project team is reducing the electrical consumption even further by implementing strict timing protocols to ensure non-essential lighting is turned off overnight.

Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.

The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.

EIN Lind CS 1

 

LED Jobsite lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.

 

EIN Jobsite CS 2

ON THE JOBSITE:

WASTE DIVERTED

An added environmental benefit is the significant amount of waste diverted from landfills because LED

Jobsite lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.

FLEXIBILITY AND VERSATILITY

Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.

With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.

LED Jobsite lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.

 

EIN Lind Case Study

www.ledjobsite.com

Related Articles


Changing Scene

  • Oct 8, 2026 - Canada Light Expo 2026 To Unite Canada’s Lighting Industry Under One Roof - CLE 2026

    Canada Light Expo 2026 To Unite Canada’s Lighting Industry Under One Roof

    Canada Light Expo 2026, the country’s premier exhibition for the lighting and LED technology sector, will return to the International Centre, Toronto, on 18–19 November 2026. Marking its 3rd edition, the event is expected to bring together more than 100 leading brands and showcase over 1,000 lighting solutions, connecting manufacturers, designers, specifiers, distributors, contractors, and… Read More…

  • Oct 7, 2026 - Eureka Wins Multiple GRANDS PRIX DU DESIGN Awards

    Eureka Wins Multiple GRANDS PRIX DU DESIGN Awards

    Eureka is pleased to announce that five of its luminaire families have been recognized in the 19th edition of the GRANDS PRIX DU DESIGN Awards. Jarry, Orelia, Scout Accessories, Torno, and Tulip all received GOLD CERTIFICATION in the Product Design – Lighting/Indoor Lighting Fixture category. The GRANDS PRIX DU DESIGN Awards is an international competition… Read More…


Design

  • LEDVANCE: Toyota Lighting Case Study – Brossard, Quebec, Canada

    LEDVANCE: Toyota Lighting Case Study – Brossard, Quebec, Canada

    Located 15 minutes from Montreal, Toyota’s Quebec Regional Office in Brossard, Canada houses a first-floor training and service area, and second-floor offices where financial services and dealer network operations are conducted.  With environmental sustainability representing a core pillar of Toyota’s mission, the Brossard location has long been committed to embracing products and practices that conserve… Read More…

  • CSC LED: How Product Availability Impacts Project Timelines

    CSC LED: How Product Availability Impacts Project Timelines

    When planning an LED lighting project, the focus is usually on performance, specifications, budget, and application requirements. But there is another factor that can have just as much impact on the project: product availability. A fixture may be the right choice on paper, but if it is not available when needed, it can affect installation… Read More…


New Products

  • SATCO|NUVO: Dual Head Security Lights – Bullet & Square Heads Models

    SATCO|NUVO: Dual Head Security Lights – Bullet & Square Heads Models

    SATCO|NUVO’s Dual Head Security Lights deliver dependable outdoor illumination for residential and commercial applications. Available in traditional bullet head designs as well as architectural square heads, these fixtures feature selectable 3000K, 4000K, and 5000K color temperatures and are offered in black, white, and bronze finishes to complement a variety of exteriors. Constructed from rugged die-cast… Read More…

  • ABB Ready-Lite: RSAUR Series – Surface-Mount Architectural Remote Fixture

    ABB Ready-Lite: RSAUR Series – Surface-Mount Architectural Remote Fixture

    The RSAUR Series surface-mount architectural remote fixture is designed specifically for installations requiring a junction box, whether recessed, surface-mounted, or suspended. Engineered for easy installation, it combines performance with simplicity and style, making it a smart choice for commercial and architectural environments. Recognized with Grands Prix du Design | Gold Certification 2026. Read More…