Case Study: Centre Block Rehabilitation

EIN Lind CS Centre Block 400

February 16, 2022

The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.

TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration

project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.

Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted LED Jobsite lighting throughout the project.

When compared to traditional bulb-based temporary lighting, LED Jobsite lighting reduces energy consumption by 65%. The project team is reducing the electrical consumption even further by implementing strict timing protocols to ensure non-essential lighting is turned off overnight.

Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.

The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.

EIN Lind CS 1

 

LED Jobsite lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.

 

EIN Jobsite CS 2

ON THE JOBSITE:

WASTE DIVERTED

An added environmental benefit is the significant amount of waste diverted from landfills because LED

Jobsite lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.

FLEXIBILITY AND VERSATILITY

Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.

With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.

LED Jobsite lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.

 

EIN Lind Case Study

www.ledjobsite.com

Related Articles


Changing Scene

  • Acuity Brands Fiscal 2022 Fourth-Quarter And Full-Year Results

    December 6, 2022 Acuity Brands, Inc. (NYSE: AYI) (the “Company”) a market-leading industrial technology company announced net sales of $1.11 billion for the fiscal fourth quarter ended August 31, 2022, an increase of 11.8 percent, or $117.6 million compared to the same period in 2021. Diluted earnings per share (“EPS”) was $3.48 in the fourth quarter of fiscal 2022, an increase of 27.9… Read More…

  • Orion Energy Systems Q2 Revenue, FY’23 Revenue Outlook

    December 6, 2022 Orion Energy Systems is a energy-efficient LED lighting and controls, maintenance service and EV charging station solutions provider out of Wisconsin. Q2 Financial Highlights CEO CommentaryMike Altschaefl, Orion’s CEO, commented, “The first half of our fiscal year was impacted by the continuation of customer project delays which began in the second half… Read More…


Design

  • LIT Lighting Design Awards: Capital Park Landscape, Victoria, BC

    LIT Lighting Design Awards: Capital Park Landscape, Victoria, BC

    December 5, 2022 Located in one of Victoria’s most historic neighborhoods, the Capital Park Mixed-Use Development is made up of seven buildings stretching across three lots and is responsible for nearly an entire city block of Victoria’s downtown core. The project took place over the span of three phases and eight years. The first phase… Read More…

  • Smith + Andersen Toronto 2022 IES Award Winning Projects

    Smith + Andersen Toronto 2022 IES Award Winning Projects

    December 5, 2022 This year, the Smith + Andersen Lighting Team received the Toronto IES 2022 Illumination Section Award and the IESNA Illumination Award of Merit for two projects: Grasett Park (Exterior Lighting Design), and St Paul’s Church (Interior Lighting Design). Each of these Toronto-based projects demonstrate a level of design excellence expected by the… Read More…


New Products

  • Stanpro Retro 5 CCT Selectable Downlight

    Stanpro Retro 5 CCT Selectable Downlight

    December 1, 2022 This Retro LED downlight offers a simple and economical retrofit solution for all traditional recessed applications. Easy installed with a quick connects wire and the E26 socket adaptor, this LED downlight is ideal for retrofitting into most of traditional 4″ and 5″-6″ housings, it will be installed in no time. The color… Read More…

  • Eureka Introduces Tangram-Trace Architectural Luminaire

    Eureka Introduces Tangram-Trace Architectural Luminaire

    November 30, 2022 Eureka announced the release of its Tangram-Trace architectural luminaire. Using bold straps and a prismatic lens, Tangram-Trace creates a dramatic aesthetic and provides high quality, diffused linear illumination. It is intended for modern environments such as conference and executive areas, hospitality applications, or reception spaces. Tangram-Trace luminaires are suspended using four-inch-wide straps,… Read More…